Powering India’s Growth: APAR’s Comprehensive Turnkey Solutions for Energy Transition


Ever wondered how India’s massive energy demands are being met? The answer is generating more power and getting that power where it needs to go, efficiently and reliably. At APAR, we’re at the forefront of this challenge, upgrading and revolutionizing energy transmission across the country. As the largest one-stop solution provider for design, manufacturing, upgrading transmission lines and testing of conductors in the world, and the world’s largest global aluminium and alloy conductor manufacturer and largest exporter from India of conductors, we’re building a greener tomorrow, one project at a time.
APAR– We’re Solution Providers
We offer end-to-end solutions; from design and manufacturing to live-line installation and testing, APAR’s Conductors Business is your partner for upgrading transmission lines. We’ve pioneered turnkey solutions, including reconductoring with HTLS (High-Temperature Low-Sag) conductors and live line installation with OPGW (Optical Ground Wire).
Setting Records & Redefining Efficiency
APAR has set a new world record by completing 800 circuit kilometres with ACCC in just 7.5 months. Additionally, APAR achieved the highest-ever line OPGW installation by any EPC in the world in a single year, totalling 6,265 kilometres.
Reconductoring Experts: Making the Most of Existing Infrastructure
Think of reconductoring as giving existing power lines a serious upgrade. We specialize in replacing old conductors with new, high-capacity HTLS conductors. This increases power capacity by 40-60% without building new towers, maximizing transmission capacity within existing corridors, minimizing land use, and ensuring the lowest cost of ownership. Here’s what that means:
- More Power: Increased transmission capacity on existing lines.
- Less Disruption: Minimizes land use and environmental impact compared to new construction.
- Lower Costs: Cost-effective alternative to building new transmission lines
APAR holds around 50% market share in domestic reconductoring projects. APAR Industries has successfully executed over 165 turnkey reconductoring projects, providing end-to-end solutions.
Powering Progress Across India: Key Projects in Action
APAR is actively enhancing power transmission capabilities across India through a series of strategic projects. Here’s a snapshot of some key initiatives:
- 400kV Kalwa-Padgha Reconductoring (Maharashtra): Enhancing power transmission with HTLS conductors and minimizing disruption through live-line ERS operations.
- 110kV Thakurli-Lonavala Reconductoring (Maharashtra): Upgrading a line for Central Railway with HTLS conductors for increased efficiency.
- 220kV Uttar Pradesh Reconductoring (Noida, Prayagraj): Ensuring reliable power supply, including during major events like the Kumbh Mela.
- 220kV Jhansi-Lalitpur EPC Project (Uttar Pradesh): Building a new 220kV line with HTLS conductors for improved efficiency and reliability.
- 220kV Adani Data Centers Reconductoring (Telangana): Providing a robust and efficient power supply to critical data centers.
- Rajasthan Reconductoring Projects (Jaisalmer, Bikaner, Jodhpur): Improving power transmission in challenging desert terrain with HTLS conductors.
End-to-End EPC Solutions
APAR offers end-to-end EPC solutions, specializing in turnkey projects for the power sector. APAR’s expertise includes designing, manufacturing, and testing, as well as live line replacement of OPGW. The EPC solutions encompass the construction of 220kV and 400kV transmission lines, even in challenging terrains like high altitudes and snow-clad areas. The company also provides comprehensive value-added services, including engineering support and installation guidelines.